In June 2024, ISC continues to deploy many auxiliary projects to make ISC one of the leading technology centers in the Mekong Delta region. These are the projects within ISC's orientation including:
Construction of office building No. 1 with an area of about 1,200m2 consists of 2 floors to serve incubating and IT businesses (the area under excavation in the picture below).
Construction of a wastewater treatment system with a treatment capacity of 35m3/day and night for the entire ISC area. This is a wastewater system designed according to a circulating model, the wastewater meets type A standards and is used for fish farming and reused for irrigation activities within the ISC area. This is an advanced wastewater treatment technology that does not use microorganisms, saves maximum electricity, has low operating costs and is commonly used in Japan. In addition, ISC will apply IoT applications to measure wastewater indicators to ensure compliance with committed wastewater quality standards. The project is expected to officially operate from August 1, 2024.
In addition, ISC completed an active lightning protection system to ensure safety for workers and electrical equipment throughout the ISC area.
Complete the 2-wheel parking lot combined with the design of an electric charging station system for electric motorbikes and electric cars. Expected to be put into use in August 2024.